|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
I. ENGINEERING - Ron Coake |
|
|
|
|
|
|
|
|
A. Water
Treatment |
|
|
|
|
1. Raw water pump
station road station (pending agreement |
|
|
|
|
from owner) |
|
|
|
|
2. Plant upgrade -
stilling wall (pending HD approval) |
|
|
|
|
3. Telemetry
upgrade |
|
|
|
|
|
|
|
|
B. Water
Distribution |
|
|
|
|
1. Water Tank
Painting |
|
|
|
|
2. Case Knife Water |
|
|
|
|
|
|
|
|
C. Solid
Waste Disposal |
|
|
|
|
|
|
|
|
D.
Facility Design |
|
|
|
|
1. Preliminary
Engineering Report (PER): |
|
|
|
|
2. Rolling Hills
sewer design |
|
|
|
|
3. Orchard Hills
sewer design |
|
|
|
|
4. Highland Park
sewer design |
|
|
|
|
5. Pulaski County
River access |
|
|
|
|
6. Case Knife
Water System |
|
|
|
|
7. Fairview Home
roofing |
|
|
|
|
8. Pump station generators |
|
|
|
|
|
|
|
|
E.
Sewerage |
|
|
|
|
1. Sewer service
along Rt. 11 from Rt. 643 to Rt. 100 |
|
|
|
|
|
|
|
|
F. Other |
|
|
|
|
1. Rt. 100
streetlights & trees |
|
|
|
|
2. Animal Shelter
Construction |
|
|
|
|
3. Water System
Vulnerability Study |
|
|
|
|
|
|
| |
II. FLEET
MAINTENANCE - Ronnie Nichols |
|
|
|
|
|
|
|
|
A.
Vehicle Maintenance |
|
|
|
|
1. Vehicle
purchase FY 03-04 |
|
|
|
|
* Sheriff
(High annual mileage vehicles) |
|
|
|
|
2. Vehicle
purchase for FY 04-05 |
|
|
|
|
|
|
|
|
B.
Refuse Collection |
|
|
|
|
1. Coordinate PSA
garbage billing with property |
|
|
|
|
records and
GIS |
|
|
|
|
|
|
|
|
C. Other |
|
|
|
|
1. Garage
appearance pride plan Phase Two - Paving |
|
|
|
|
with Town of
Pulaski road millings |
|
|
|
|
|
|
|
|
|
|
|
| |
III.
MANAGEMENT SERVICES - Nancy Burchett |
|
|
|
|
|
|
|
|
A.
Finance |
|
|
|
|
|
|
|
|
B.
Personnel |
|
|
|
|
1. Draft policy on
calculating work hours increments |
|
|
|
|
|
|
|
|
C.
Internal Control |
|
|
|
|
|
|
|
|
D. Other |
|
|
|
|
1. Church &
school exhibits - 3rd Floor Old Courthouse |
|
|
|
|
2. Exhibits in
County Administration Building |
|
|
|
|
|
|
|
|
E. |
Jamestown 2007 |
|
|
|
|
|
|
| |
IV.
OPERATIONS |
|
|
|
|
|
|
|
|
A. Emergency
Services |
Emergency Management |
|
|
|
|
1. Homeland
Security Assessment & Strategy Program |
|
|
|
|
|
|
|
|
B.
General Properties |
|
|
|
|
1. Front entrance
permanent handicap ramp |
|
|
|
|
|
|
|
|
C.
Construction Management |
|
|
|
|
1. CAB renovation: |
|
|
|
|
a. Elevator |
|
|
|
|
b. Foyer |
|
|
|
|
c. Central Gym restrooms |
|
|
|
|
d. Central Gym kitchen improvements |
|
|
|
|
2. Conduct a
building space needs/reuse study |
|
|
|
|
|
|
|
|
D. PSA
Administration |
|
|
|
|
1. Study
county-wide uniform utility rates |
|
|
|
|
|
|
|
|
E. Other |
|
|
|
|
1. Health Dept.
office location |
|
|
|
|
2. Hiwasee
Fire/Rescue Addition |
|
|
|
|
3. Dublin Rescue
Squad |
|
|
|
|
4. Upgrade of
dispatch radio system |
|
|
|
|
|
|
| |
V.
COMMUNITY DEVELOPMENT - David Tickner |
|
|
|
|
|
|
|
|
A.
Economic Development |
|
|
|
|
1. Continue
industrial recruit efforts |
|
|
|
|
2. Increase
diversification of the local economy |
|
|
|
|
3. Improve utilization of shell & Bob White buildings |
|
|
|
|
|
|
|
|
B. Grant
Administration |
|
|
|
|
|
|
|
|
C.
Intergovernmental Relations |
|
|
|
|
1. School Building
Program |
|
|
|
|
* School
Building Plan Review |
|
|
|
|
*
Claremont/Northwood/Draper Schools |
|
|
|
|
2. Education |
|
|
|
|
*Maintain high
educational standards |
|
|
|
|
*Promote GED
achievement within work force |
|
|
|
|
*Fund school
building needs |
|
|
|
|
*Include full
size sym in new buildings for |
|
|
|
|
community
use |
|
|
|
|
3. Improve working
communication & operational |
|
|
|
|
agreements
with both towns |
|
|
|
|
4. Improve
coordination between Planning Comm. |
|
|
|
|
and PSA in
ecouraging development in appropriate |
|
|
|
|
portions of
the county |
|
|
|
|
|
|
|
|
D. Land
Use |
|
|
|
|
1. Development of Rt. 100 appearance standards
Newbern |
|
|
|
|
to Dublin
(consider entrance sign) |
|
|
|
|
2. Special Use
Permit Standards (Report & request
for direction) |
|
|
|
|
3. Land Use for
Claytor Lake (to be done as part of Comprehensive Plan) |
|
|
|
|
4. Comprehensive
Plan update |
|
|
|
|
5. Subdivision
Standards |
|
|
|
|
|
|
|
|
E.
Litter Control |
|
|
|
|
|
|
|
|
F. Code
Enforcement |
|
|
|
|
1. New code
contractor orientation |
|
|
|
|
2. Determine
availability of Bobby Lorton for assisting |
|
|
|
|
3. Continue
property cleanup particularly at entrances |
|
|
|
|
to the county,
corridors & high visibility areas |
|
|
|
|
4. Coordination
with Sheriff's Office |
|
|
|
|
|
|
|
|
G. Other |
|
|
|
|
1.
Residential/Commercial Use of Surplus Pro- |
|
|
|
|
perty (2
parcels) - Rt. 11 East of Mt. Pleasant |
|
|
|
|
2. Development of
Customer Service Center - Fairlawn |
|
|
|
|
|
|
| |
VI.
COMMUNITY RELATIONS |
|
|
|
|
|
|
|
|
A.
Office on Youth |
|
|
|
|
|
|
|
|
B.
Courthouse |
|
|
|
|
|
|
|
|
C.
Recreation |
|
|
|
|
1. Construct 2-3
smaller picnic shelters at RP |
|
|
|
|
seating 50
persons (pending budget work) |
|
|
|
|
2. Survey citizens
to determine interest in an indoor |
|
|
|
|
activities center similar to what has
been done in |
|
|
|
|
Christiansburg
& Radford |
|
|
|
|
3. Harry DeHaven
Park Improvements |
|
|
|
|
|
|
|
|
D. Staff
Communications |
|
|
|
|
1. Bid
Cellular/Pager Services |
|
|
|
|
|
|
|
|
E.
Library |
|
|
|
|
|
|
|
|
F.
Housing Development |
|
|
|
|
|
|
|
|
G.
Sheriff's Office Relocation |
|
|
|
|
|
|
|
|
H. Other |
|
|
|
|
1. County entrance
signs: |
|
|
|
|
*Fairlawn Rt.
114 |
|
|
|
|
*Fairlawn Rt.
11 |
|
|
|
|
2. Educate
citizens on services provided through |
|
|
|
|
newsletter,
citizen report, internet, cable TV, etc. - |
|
|
|
|
school civic
education |
|
|
|
|
|
|
| |
VII.
INFORMATION TECHNOLOGY |
|
|
|
|
|
|
|
|
A. Hardware |
|
|
|
|
1. Map network |
|
|
|
B. Software |
|
|
|
|
|
|
| |
|
|
|
|
| |
VIII.
Road Matters |
|
|
|
|
|
|
|
|
A Rt. 100
Deceleration lane into New Dublin Presbyterian Church |
Public Safety |
|
|
|
|
1. Set speed limits at time road are upgraded/consider |
|
|
|
|
community
character in setting limits |
|
|
|
|
2. Improve communications for fire & sheriff's office |
|
|
|
|
3.
Improve public safety radio dispatch system - |
|
|
|
|
consider a
safer location |
|
|
|
|
4. Address traffic
problems in the vicinity of PCHS |
|
|
|
|
5. Consider increased participation in VDOT |
|
|
|
|
Revenue Sharing
Program |
|
|
|
|
6. Lobby General Assembly for increased secondary |
|
|
|
|
road funding |
|
|
|
|
|
|
|
|
B. |
Follow-up from Previous Board Meetings: |
District |
|
|
|
1. Memorial Bridge
Update & Rt. 11 Entrance Sign |
Cloyd |
|
|
|
2. Allisonia
Bridge Repairs/Replacement |
Ingles |
|
|
|
3. Low Water
Bridge at Little Creek (Pending environmental clearance) |
Massie |
|
|
|
4. PCHS Turn Lane
cost estimate for revenue sharing funding |
Massie |
|
|
|
5. Rt. 100 Turn
Lane (VDOT advised costs to be more than $100,000 |
Draper |
|
|
|
a. McDonalds |
|
|
|
|
b. Southbound onto South I-81 ramp |
|
|
|
|
6. Rt. 711, Mines
Road Advertisement |
Robinson |
|
|
|
7. Guardrail Listing - Add Road Names and District |
|
|
|
|
8. Dallas Freeman Road, Rt. 778, Spot Widening |
Ingles |
|
|
|
9. Rt. 693 Request for Speed Study |
Ingles |
|
|
|
10. Rt. 11/Morehead Lane Speed Study |
Robinson |
|
|
|
11. Informal Speed Study on Rt. 626, Hazel Hollow Road,
north of Rt. 611 |
Ingles |
|
|
|
12. Drainage Issues at end of Memorial Bridge |
Cloyd |
|
|
|
13. Robinson Tract Road Warning Signs |
Robinson |
|
|
|
14. Bridge on Rt. 100 North |
Cloyd |
|
|
|
15. Cloyd's Mountain Road Improvements (potholes &
breakage) |
Cloyd |
|
|
|
16. Julia
Simpkins Road Embankment |
Ingles |
|
|
|
17. Addition of Bike Lanes to State Maintained Roads |
|
|
|
|
18. Pothole at Rt. 100 & 114, coming from Radford |
Cloyd |
|
|
|
19. Brush Cutting Along Bank at Fairview Home |
Massie |
|
|
|
|
|
|
|
C. |
COMPLETED ITEMS |
|
|
|
|
1. Riverbluff Subdivision Improvements |
|
|
|
|
2. Wilderness Road Shoulder Repairs |
|
|
|
|
3. State Park Road Repairs |
|
|
|
|
4. Rt. 634 Scraping Update |
|
|
|
|
5. Rt. 114 Bridge Markers Removal |
|
|
|
|
6. Riverhills Townhomes Road Issues |
|
|
|
|
7. Rt. 672, Lowman's Ferry Road, Drop Off from Pavement |
|
|
|
|
8. Request to Cut
Brush Back on Old. Rt. 11 at the |
|
|
|
|
Bagging Plant
Intersection |
|
|
|
|
9. Rt. 100
Deceleration lane into New Dublin Presbyterian Church |
|
|
|
|
10. Hatcher Road Improvements |
|
|
|
|
11. Locust Drive - Request for Signage, Etc. |
|
|
|
|
12. Portion of
Kent Farm Road - Rural Rustic Road Eligibility determination |
Massie |
|
|
|
13. Dunkard's
Bottom Drainage |
Ingles |
|
|
|
14. Manns Drive Brush Cutting |
Cloyd |
|
|
|
15. Hazelwood Drive Paving Requirements |
Cloyd |
|
|
|
16. Brush Cutting - Fariss Mines Road from Boones Furnace
Rd. |
Ingles |
|
|
|
17. New River Post Office Sinkhole |
Cloyd |
|
|
|
18. Rt. 11 Passing Zone at Stone Ridge Subdivision |
Cloyd |
|
|
|
19. Dunkard's Bottom School Bus Stop Signage |
Ingles |
|
|
|
20. Delton Road
Culvert Status (Pending environmental clearance) |
Draper |
|
|
|
21. Robinson Tract Road at Bridge |
Robinson |
|
|
|
22. Horseshoe Loop & Black Hollow Lane Speed Limit
Signage |
Massie |
|
|
|
23. School Signs |
|
|
|
|
24. Belspring Road Removal of Passing Zones |
Cloyd |
|
|
|
25. Exit 101 Southbound Ramp Turning Radius |
Ingles |
|
|
|
26. Rt. 11 Asphalt Patching |
Draper |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|